In its most recent State of Care Report, the CQC has a lengthy and detailed ‘area of concern’ section on DoLS, the key findings being as follows:

  • Too many people are waiting too long for a Deprivation of Liberty Safeguards (DoLS) authorisation, despite multiple examples of local authorities trying their best to reduce backlogs and ensure sustainable improvement.
  • We remain worried about the rights of people at the heart of the DoLS system. We continue to see people in vulnerable circumstances without legal protection, which not only affects them but also their families, carers, staff and local authorities.
  • The system has needed reform for over 10 years. Unless there is substantial intervention, we are concerned that these challenges will continue.

In relation to backlogs, the CQC notes that:

Variation in backlogs between different local authorities means people in similar situations may have different experiences of the DoLS system because of where they live. Many factors contribute to this variation, including budget allocation, the make-up of local populations, and the number of hospitals and care homes in an area.

Local authority backlogs also have a knock-on impact on hospital and care home staff: while waiting for DoLS applications to be reviewed, they have to balance keeping people safe with protecting their rights. Our inspectors told us about staff feeling stressed and confused trying to navigate the DoLS system when waiting for an authorisation. Worryingly, our inspections and assessments have also highlighted instances where backlogs in processing existing applications mean some care providers have stopped submitting new applications. This means people have restrictions placed on them without an application or any legal safeguards.

To understand the reasons for the backlog, CQC surveyed representatives from the National DoLS Leads Network and heard the views of over 50 respondents from supervisory bodies across England. This section is worth setting out in full:

We heard widespread concern from the local authorities that they are often significantly under-resourced to process increasing volumes of DoLS applications, as their funding has not increased in line with the number of people requiring assessments. One local authority told us:

DoLS is a broken system. It was designed for a pre-Cheshire West time with relatively few applications. It is impossible to make it work with the resources we have, leading to a big backlog…The situation is so bad that, if we just stopped getting any applications and just assessed people from the backlog, we would be doing this for around 18 months just to clear it.

Insufficient staffing levels were also identified as a primary barrier to performance. Many supervisory bodies are struggling to recruit enough assessors, with some local authorities relying significantly on independent assessors to manage the volume of applications. Some respondents noted high staff turnover within DoLS teams, describing working in this area as a “marmite experience” where members of staff either thrive, or more often, leave the service.

Amid these challenging circumstances, a member of our external stakeholder group described local authorities going “above and beyond to create systems that are as safe as possible.” NHS England data shows that the number of applications completed by local authorities has increased over the last 5 years by an average of 9% each year. But while DoLS backlogs decreased by 2% in 2023/24, the number of people waiting for an authorisation remains significant. In our assessments of local authorities, we have seen multiple examples of supervisory bodies trying their best to reduce backlogs and ensure sustainable improvement. For example, many local authorities adopt risk-based approaches and tools to prioritise applications. We also saw local authorities recruiting and training more best interests assessors.

Respondents to our National DoLS Leads Network survey frequently cited the ADASS screening tool as a way of helping local authorities to prioritise applications, by categorising them as either high, medium or low priority. However, this method relies on detailed, accurate DoLS applications. We heard that many local authorities are not always confident that the information services provide on DoLS applications is correct. This increases the risk that people who urgently require an assessment are not being appropriately prioritised. Although tools can help local authorities to identify those in need of urgent attention, the statutory 21-day timeframe applies to all standard DoLS applications and the need to prioritise may be another symptom of a broken DoLS system.

We are also concerned that the use of prioritisation tools may result in some groups of people, such as people with a learning disability or living with dementia, being disproportionately affected by delays in processing DoLS applications. A respondent from the National DoLS Leads Network noted that while these people usually meet the requirements for DoLS, they often do not meet the prioritisation criteria and may be “overlooked”. We also heard from a member of our external stakeholder group about some assessments being carried out virtually. While this may offer greater flexibility, virtual assessments are not always suitable for the people who are being assessed. A member of our external stakeholder group reflected that differences in the way local authorities approach DoLS makes it difficult to support managers of care homes spread across different counties.

Local authorities told us that ongoing issues with the level of understanding of the safeguards among health and social care staff can exacerbate the backlogs. We heard that applications from care homes and acute hospitals are not always appropriate, and we have also seen evidence of this, with some staff unclear on the circumstances that require a DoLS authorisation. This risks people who need the safeguards getting lost in the high volume of referrals, or not having an application made when they need one. Local authorities found that the quality of mental capacity assessments made by providers before they submit an application was sometimes poor, which can also result in unnecessary applications. It also means that they may need to contact providers to get information that should have been included in the application, thereby delaying the process and requiring additional resources from all parties.

Another factor that has a negative impact on the backlogs is a lack of communication between providers and local authorities. When providers apply promptly for DoLS renewals, it can help reduce workloads for supervisory bodies. Yet, we heard this does not always happen in practice. In addition, local authorities are not always informed of important changes following submissions, such as a person dying, being discharged, admitted to hospital or their condition changing. These people therefore remain on the waiting list for DoLS when they may no longer need to be. In other circumstances, providers may also not communicate important changes such as objections or increased restrictions, preventing local authorities from giving priority to some assessments that need it.

It is not entirely clear from this section whether or not the CQC endorses the use of the ADASS (or any other) prioritisation tool.

The variation in the application of DoLS was also a theme CQC picked up in relation to the services themselves.

Our assessments highlighted some differences between hospitals and care homes in the way DoLS are applied. Because the length of stay in an acute hospital tends to be shorter than in a care home, DoLS backlogs mean often patients are not assessed before they are discharged or moved elsewhere. This means that people at the heart of the process may not practically benefit from the protection afforded by the safeguards for most of their hospital stay, despite the work and resources used by providers and local authorities to follow the process in line with the law.

Where a person has a DoLS authorisation in place during a hospital stay, we have seen the positive effects of this on their care. For example, in one case the authorisation meant staff were more aware of the patient’s needs, which was evident in care records. By better understanding the patient and tailoring their care, staff were able to prevent escalations.

However, we also identified a lack of communication about DoLS at some acute hospitals, which affected numerous patients on the ward. For example, we found that people sharing a ward with someone subject to a DoLS authorisation did not always know that certain restrictions, like not being able to open locked doors, only applied to one person. In mental health inpatient settings, we continue to see different interpretations of the interface between the Mental Health Act and the Mental Capacity Act, with the safeguards being used more frequently in wards for older adults.

Although staff should be familiar with the conditions for a DoLS authorisation, this is not always the case. We identified limited oversight of DoLS at some services and we are concerned that the safeguards are viewed as a ‘management issue’ rather than something every team member needs to engage with to protect people’s human rights. A local authority also told us that frequent staff and management changes in care homes represents a challenge, as local authorities do not have the resources to regularly undertake in-depth work with providers to improve their understanding and application of DoLS.

While there is a clear need for further training, we found examples of a lack of training on DoLS in anticipation of the introduction of the Liberty Protection Safeguards. A member of our external stakeholder group explained that providers had invested energy preparing for LPS and some were finding it difficult to adjust to uncertainty around its implementation at such a late stage. However, it is vitally important that services ensure staff have adequate knowledge of DoLS to protect people’s human rights – both now and in the future.

It is clear that there are wider problems than merely DoLs as regards the understanding of the MCA:

Concerns around providers’ knowledge of DoLS and the MCA are mirrored in an analysis of our regulatory enforcement data on Notices of Proposal. At the point of registration, we expect all providers to demonstrate a clear understanding of the MCA and, when applicable, DoLS. As the regulator, we will serve a Notice of Proposal to impose conditions on a new provider or refuse registration if they cannot demonstrate this. We analysed a sample of 139 Notices of Proposal issued in 2023/24 to new adult social care providers and managers applying to register with CQC. This found that almost half the Notices (66) were based on a lack of compliance with standards outlined in the Mental Capacity Act (MCA). In many cases, applicants also failed to demonstrate compliance with other regulations.

The Court of Protection gets a look in later in the discussion:

Several local authorities felt that more challenges to DoLS authorisations have been brought to the Court of Protection in recent years. When a DoLS authorisation is in place, people have a right to have these arrangements reviewed by a court. It is positive that people are aware of their rights to challenge a deprivation of liberty and are supported to do so. However, a local authority also told us that this can be a time-consuming process, which has a further impact on their resources.

Earlier in this report, we raised concerns about older teenagers who may fall through the gaps when accessing mental health services. Similar concerns about the quality of transitions from children to adult services have emerged through our DoLS survey, with one local authority noting that a ‘start again syndrome’ may happen when a young person enters adult services. They said the information provided by children’s services is often insufficient for planning a DoLS application, which can lead to delays in the DoLS process when the person turns 18. At present, the Court of Protection is also responsible for authorising a deprivation of liberty for young people aged 16 and 17 who lack mental capacity, as DoLS only applies to adults. We heard some frustration from local authorities about delays in LPS implementation, as the new scheme would have helped to speed up authorisations for these young people. Like the DoLS process for adults, we have heard that there continue to be delays associated with the Court of Protection authorisation process.

The concluding remarks are stark:

The DoLS system has needed reform for over 10 years. Unless there is substantial intervention, we are concerned that these challenges will continue, leaving people at the heart of this process without the key human rights safeguards that the DoLS system was intended to offer.

In 2023/24, approximately half of the total number of DoLS applications completed were closed without any assessments happening. This means that, in many cases, the DoLS application process may not bring increased safeguards for people’s human rights, despite the efforts and resources used by care homes and hospitals to submit applications, and local authorities’ work to process and triage these.

With the volume of applications continuing to increase, the current system means that local authorities remain the only organisations able to process them, and many have told us they do not have sufficient resources to cope with the demand. Supervisory bodies told us that increased funding, an updated Code of Practice, better training and regulatory oversight are all factors which could help to improve outcomes for people while we wait for the LPS to be implemented.

While we heard that DoLS remains an “overly bureaucratic system”, local authorities across England have also implemented some improvements to help existing processes run more smoothly. These include:

  • making assessments proportionate and using equivalent assessments when appropriate
  • streamlining administrative processes, using IT systems and updating forms
  • developing strong working relationships between local authorities and providers to improve communication, especially when circumstances change or when a renewal is due
  • workshops and training for providers to reduce the number of inappropriate applications they receive and improve the accuracy of applications.

Despite these efforts, we remain concerned that the number of people requiring the legal protection afforded by DoLS continues to increase and the system is unable to cope with this demand. Ongoing issues with the DoLS system will disproportionally affect certain groups, such as disabled people and older people, who are more likely to need the safeguards. A recent report by Age UK highlighted that in 2022/23, 84% of DoLS applications were made for people aged 65 or over, and almost 50,000 people died while waiting for their application to be processed. Reflecting on the operation of DoLS, the charity said, “The reality therefore is that the rights of some of the most vulnerable older people in our society have been and continue to be routinely denied.”

Too many people are waiting too long for a DoLS authorisation, while variation in the level of knowledge of staff means that others may not have a DoLS authorisation in place when they need one. For many, the current DoLS system is not providing the vital safeguards they need. After a decade of chronic and widely documented issues, urgent action is required to ensure the system does not continue to fail people in the future.